Planning
Assistance with your final product selections, prepare the construction agreement that includes scopes of work, begin/end dates, payment terms, licensing and insurance information. Order products & materials, schedule trade partners, and apply for the building permits.
Preparation
Deliver dumpster (placed on ground protection) and portable toilet for our workers. Surface and floor protection includes roll-out mats, draped plastic over furniture, dust containments, designated areas for tools and materials.
Demolition
Remove and discard contents per space including accesssories, vanity, toilet, tub/shower, first layer of floor covering, and first layer of wall covering in shower alcove.
HVAC (50 – 70) cfm
Install an exhaust fan vented to the exterior through a sidewall or soffit.
Plumbing Fixtures (4+)
Install drain and water supply lines, new shutoff valves, p-traps, fixtures, and test for leaks for a shower, vanity and toilet.
Electrical Devices (8)
Install wiring to 8 devices (includes switches, outlets and surface and recessed lighting).
Insulation
Install fiberglass batt type insulation in exterior walls (R11/13/15) & ceilings (R19/30/38).
Drywall
Installation of mold/mildew resistant drywall, tape, compound, sand and prepare your walls and ceiling for painting.
Tile: Main Floor (40sf)
Floor areas receive anti-fracture membrane to guard against cracking. Tile setters will then install ceramic or porcelain tiles set in the determined pattern. Grout and seal any joints.
Finishes; Trim/Molding (60) Lf.
Carpenters will install new molding up to 60 Lf. We will also be installing your towel bar, toilet paper dispenser, hand towel ring, shower rod, and vanity mirror.
Painting
Prepare new surfaces with one coat of acrylic primer. Apply two coats to walls of one color in a flat finish. Apply two coats to ceilings of one color in a flat finish. Apply one coat to window, door, base moldings and room facing door of one color in a semi-gloss finish.